iz · Bench · Karadeniz Ereğli Integrated Works

steel · Karadeniz Ereğli · 400,000 t/y

Karadeniz Ereğli Integrated Works

Erdemir

01 Snapshot

Audit-grade Scope 1 · 2024
6,673,266
tCO₂ · derived · operator-audited financial-grade
iz-1 prediction (LODO)
7,941,227
+19% vs. truth
EU CBAM default
7,600,000
+14% vs. truth
95% conformal prediction interval (global, n=21): 3,858,90616,342,218 tCO₂ (truth inside ✓)
95% interval restricted to steel-BF/BOF calibration set: 6,606,5949,545,477 tCO₂ (truth inside ✓ · undercoverage caveat at small n)

Open printable audit summary → One-page PDF you can hand to a verifier.

02 Facility data

Company
Erdemir
Plant
Karadeniz Ereğli Integrated Works
Sector
steel
City
Karadeniz Ereğli
Capacity
4,000,000 t/y
Label source
disclosure
Provenance
Derived from a published intensity × disclosed activity, or company-group EF × plant capacity.
iz-1 runs
5 LODO outer × 3 inner seeds = 15 total

03 Source citation

Erdemir 2024 IAR (group 17.34M − İsdemir 10.66M from p115)

Erdemir IAR archive

Subtraction: Ereğli ≈ Group − İsdemir; assumes no other major subsidiary

05 Hyperspectral coverage

9 EnMAP L2A scenes index this plant (7 with <1% cloud cover). Source: DLR EOC STAC. Following Borger et al. (2025), these scenes can yield direct CO₂ and NO₂ plume retrievals at ~30 m spatial resolution.

Lowest cloud cover scenes (showing top 5):

Downloads require a free DLR EOWEB account (see enmap_access_howto.md).

06 Verify / correct

If you're an operator or analyst with a more recent disclosure than what's shown above:

Corrections that include a verifiable public source land within 24 hours. All data is Apache-2.0 licensed; methodology in paper/iz_v0.md.