iz · Bench · Büyükçekmece Cement Plant

cement · Büyükçekmece · 250,000 t/y

Büyükçekmece Cement Plant

Akçansa

01 Snapshot

Audit-grade Scope 1 · 2025
1,514,000
tCO₂ · allocated · operator-audited financial-grade
iz-1 prediction (LODO)
1,668,236
+10% vs. truth
EU CBAM default
3,960,000
+162% vs. truth
95% conformal prediction interval (global, n=21): 810,6513,433,056 tCO₂ (truth inside ✓)

Open printable audit summary → One-page PDF you can hand to a verifier.

02 Facility data

Company
Akçansa
Plant
Büyükçekmece Cement Plant
Sector
cement
City
Büyükçekmece
Capacity
2,500,000 t/y
Label source
disclosure
Provenance
Allocated from operator group Scope 1 by a disclosed physical share (clinker tonnage / crude steel tonnage).
iz-1 runs
5 LODO outer × 3 inner seeds = 15 total

03 Source citation

Akçansa 2025 IAR p46 (group Scope 1 gross 5,484,015) × Büyükçekmece clinker share p167 (1,943/7,037 = 27.6%)

Akçansa IAR archive

Allocated from Akçansa 2025 group Scope 1 (5,484,015) × Büyükçekmece clinker share 27.6%. Group total is audit-grade; per-plant split is by disclosed clinker tonnage, not directly disclosed.

05 Hyperspectral coverage

5 EnMAP L2A scenes index this plant (1 with <1% cloud cover). Source: DLR EOC STAC. Following Borger et al. (2025), these scenes can yield direct CO₂ and NO₂ plume retrievals at ~30 m spatial resolution.

Lowest cloud cover scenes (showing top 5):

Downloads require a free DLR EOWEB account (see enmap_access_howto.md).

06 Verify / correct

If you're an operator or analyst with a more recent disclosure than what's shown above:

Corrections that include a verifiable public source land within 24 hours. All data is Apache-2.0 licensed; methodology in paper/iz_v0.md.