Büyükçekmece Cement Plant

Akçansa · cement · Büyükçekmece
iz · TR-MRV-Bench v0.1
akcansa-buyukcekmece
Issued: 2025

1 · Facility identity

Company / operator
Akçansa
Plant name
Büyükçekmece Cement Plant
Sector (CBAM scope)
cement
Location
Büyükçekmece, Türkiye
Nameplate capacity
2,500,000 t/y

2 · Emission figures (tCO₂)

Audit-grade Scope 1 · 2025
1,514,000
disclosure · allocated · operator_audited
iz-1 prediction (LODO)
1,668,236
15-seed median (iz-1 within +10.2% of audit)
EU CBAM default value
3,960,000
(EU default overstates by +162%)

95% conformal prediction interval (global, n=21 calibration): 810,651 – 3,433,056 tCO₂.

3 · Source citation for audit-grade Scope 1

Akçansa 2025 IAR p46 (group Scope 1 gross 5,484,015) × Büyükçekmece clinker share p167 (1,943/7,037 = 27.6%)

Allocated from Akçansa 2025 group Scope 1 (5,484,015) × Büyükçekmece clinker share 27.6%. Group total is audit-grade; per-plant split is by disclosed clinker tonnage, not directly disclosed.

4 · Methodology (iz-1)

iz-1 is a 2-layer browser-resident MLP with WebGPU-accelerated LoRA-shaped weights, trained on TR-MRV-Bench v0 (59 Turkish CBAM-scope facilities; 21 audit-grade Scope 1 labels with operator-PDF citations). Inputs: nameplate capacity, geo-coordinates, sector + steel route one-hot, Climate-TRACE-derived capacity factor and activity, operator-disclosed capacity factor (non-leaky in LODO), and Sentinel-5P NO₂ activity proxy. Evaluation: stratified leave-one-disclosure-out with 5 outer × 3 inner = 15 seeds per held-out facility. Headline: median 87% reduction in log-MAE vs. EU CBAM default; closed-form formula (capacity × route-EF × cf) reaches the same headline within statistical noise.

5 · Verifier checklist

  1. ☐ Confirm Scope 1 line item in the cited source matches the value above (tCO₂ basis; not CO₂-equivalent if different).
  2. ☐ Verify operator's verification statement (ISO 14064-1 / TSRS / financial audit) attached to the source.
  3. ☐ Cross-check capacity against latest published cement / steel / aluminum / fertilizer association registry.
  4. ☐ If using iz-1 prediction as input to CBAM Article 4(2) actual-emission declaration: the prediction is a model output, not a measurement. Verifier must independently support the underlying activity data.
  5. ☐ Confirm the conformal prediction interval covers the operator's claimed Scope 1.

6 · License and citation

TR-MRV-Bench v0 is Apache-2.0 licensed. The benchmark, methodology, and per-facility data are public at github.com/abgnydn/iz and iz-b0n.pages.dev. Cite: Günaydın (2026), "TR-MRV-Bench: a public per-facility emissions benchmark for Turkish CBAM-scope industry, with a physics baseline that beats the EU CBAM default by 87%."