iz · Bench · Hereke Cement Plant

cement · Hereke · 570,000 t/y

Hereke Cement Plant

Nuh Çimento

01 Snapshot

Audit-grade Scope 1 · 2024
3,573,278
tCO₂ · direct · ISO 14064-1 verified
iz-1 prediction (LODO)
2,480,606
-31% vs. truth
EU CBAM default
9,028,800
+153% vs. truth
95% conformal prediction interval (global, n=21): 1,205,4095,104,829 tCO₂ (truth inside ✓)

Open printable audit summary → One-page PDF you can hand to a verifier.

02 Facility data

Company
Nuh Çimento
Plant
Hereke Cement Plant
Sector
cement
City
Hereke
Capacity
5,700,000 t/y
Label source
disclosure
Provenance
Per-plant Scope 1 directly disclosed by operator.
iz-1 runs
5 LODO outer × 3 inner seeds = 15 total

03 Source citation

Nuh 2024 IAR p59 (ISO 14064-1:2018 verified)

Single-site (Nuh has only Hereke) — third-party verified Scope 1

05 Hyperspectral coverage

7 EnMAP L2A scenes index this plant (2 with <1% cloud cover). Source: DLR EOC STAC. Following Borger et al. (2025), these scenes can yield direct CO₂ and NO₂ plume retrievals at ~30 m spatial resolution.

Lowest cloud cover scenes (showing top 5):

Downloads require a free DLR EOWEB account (see enmap_access_howto.md).

06 Verify / correct

If you're an operator or analyst with a more recent disclosure than what's shown above:

Corrections that include a verifiable public source land within 24 hours. All data is Apache-2.0 licensed; methodology in paper/iz_v0.md.