iz · Bench · Bursa Cement Plant

cement · Bursa · 200,000 t/y

Bursa Cement Plant

Bursa Çimento

01 Snapshot

Audit-grade Scope 1 · 2024
1,121,545
tCO₂ · direct · ISO 14064-1 verified
iz-1 prediction (LODO)
530,786
-53% vs. truth
EU CBAM default
3,168,000
+182% vs. truth
95% conformal prediction interval (global, n=21): 295,831952,346 tCO₂ (truth outside ✗)
95% interval restricted to cement calibration set: 303,794927,384 tCO₂ (truth outside ✗ · undercoverage caveat at small n)

Open printable audit summary → One-page PDF you can hand to a verifier.

02 Facility data

Company
Bursa Çimento
Plant
Bursa Cement Plant
Sector
cement
City
Bursa
Capacity
2,000,000 t/y
Label source
disclosure
Provenance
Per-plant Scope 1 directly disclosed by operator.
iz-1 runs
5 LODO outer × 3 inner seeds = 15 total

03 Source citation

Bursa Çimento 2024 TSRS Sustainability Report p59 (Tablo 24)

Single integrated plant Bursa Çimento Fabrikası A.Ş. (Kestel). ISO 14064-1 verified by TÜRKAK-accredited body; TSRS limited assurance by PKF İstanbul. EF=0.532 t/t grey clinker (process). Excludes Çemtaş steel (46,079) and Roda Liman (3,206) subsidiaries.

05 Hyperspectral coverage

8 EnMAP L2A scenes index this plant (2 with <1% cloud cover). Source: DLR EOC STAC. Following Borger et al. (2025), these scenes can yield direct CO₂ and NO₂ plume retrievals at ~30 m spatial resolution.

Lowest cloud cover scenes (showing top 5):

Downloads require a free DLR EOWEB account (see enmap_access_howto.md).

06 Verify / correct

If you're an operator or analyst with a more recent disclosure than what's shown above:

Corrections that include a verifiable public source land within 24 hours. All data is Apache-2.0 licensed; methodology in paper/iz_v0.md.