iz · Bench · Afyonkarahisar Cement Plant

cement · Afyonkarahisar · 180,000 t/y

Afyonkarahisar Cement Plant

Afyon Çimento

01 Snapshot

Audit-grade Scope 1 · 2024
1,200,000
tCO₂ · direct · ISO 14064-1 verified
iz-1 prediction (LODO)
686,817
-43% vs. truth
EU CBAM default
2,851,200
+138% vs. truth
95% conformal prediction interval (global, n=21): 333,7471,413,398 tCO₂ (truth inside ✓)

Open printable audit summary → One-page PDF you can hand to a verifier.

02 Facility data

Company
Afyon Çimento
Plant
Afyonkarahisar Cement Plant
Sector
cement
City
Afyonkarahisar
Capacity
1,800,000 t/y
Label source
disclosure
Provenance
Per-plant Scope 1 directly disclosed by operator.
iz-1 runs
5 LODO outer × 3 inner seeds = 15 total

03 Source citation

Afyon Çimento 2024 TSRS Sustainability Report p23

Standalone subsidiary (Çimsa 51%); 1.1M ton cement production; ISO 14064 + TSRS limited assurance

05 Hyperspectral coverage

8 EnMAP L2A scenes index this plant (4 with <1% cloud cover). Source: DLR EOC STAC. Following Borger et al. (2025), these scenes can yield direct CO₂ and NO₂ plume retrievals at ~30 m spatial resolution.

Lowest cloud cover scenes (showing top 5):

Downloads require a free DLR EOWEB account (see enmap_access_howto.md).

06 Verify / correct

If you're an operator or analyst with a more recent disclosure than what's shown above:

Corrections that include a verifiable public source land within 24 hours. All data is Apache-2.0 licensed; methodology in paper/iz_v0.md.